Northern Beaches Council

Manly Aquatic Centre Northern beaches Council Solar PV System by The Green Guys Group

Our SOLAR SOLUTION has provided Manly Aquatic Centre over $57,646 savings in energy costs annually & a step closer to zero environmental impact operations.

Wattle Grove Shopping Village

Wattle Grove Shopping Village Solar Microgrid by The Green Guys Group

With Coles and over 16 specialty stores all on one convenient level, Wattle Grove Shopping Village is looking at reducing their operational costs through clean, renewable energy.

Campsie Centre

Campsie Centre Solar Microgrid by The Green Guys Group

The Green Guys Group implemented Solar Microgrid solution will reduce Campsie Centre’s operational costs through our zero-cost solution, utilising clean, renewable Solar energy.

Greenway Wetherill Park

Greenway Wetherill Park Solar Microgrid by The Green Guys Group

With our SOLAR MICROGRID solution, the shopping centre will receive an estimated $150,000 in annual roof rental revenue and 27.6% in electricity savings.

King Street Wharf

King Street Wharf LED Lighting Upgrade by The Green Guys Group

We upgraded all the inefficient common area lighting with energy-efficient LED lighting. A total of 1,040 LED lights were installed, saving over $95,000 on energy costs annually.

Nestle

Nestle LED Lighting Upgrade by The Green Guys Group

We installed a LED LIGHTING solution with zero impact on the site’s 24-hour operation, saving Nestle $150,829 in annual energy costs.

Healthe Care

Healthe Care Brunswick Hospital LED Lighting Upgrade by The Green Guys Group

We delivered a national LED lighting & solar PPA solution with minimal impact on the hospitals’ round-the-clock operations, saving Healthe Care more than $4M in electricity bills over the next 10 years.

Port Hacking High School (Dept. of Education NSW)

Port Hacking High School LED Lighting Upgrade by The Green Guys Group

1,350 fluorescent lights were replaced with energy-efficient LED lights. The School saved more than $27,000 on the total cost of the upgrade and we successfully delivered the project with zero impact on the daily learning activities.